BS5837 Tree Reports and Tree Surveys in Sheerwater
Some enquiries need baseline survey information. Others already have a survey and need an AIA, AMS, Tree Protection Plan or supervision. We review what is already there before recommending more work.
If you already have a survey, send it. If you already have permission, send the condition. We can usually work out very quickly whether the next useful step is an update, an AIA, an AMS/TPP or site supervision.
For this sort of job we normally check how close the excavation gets, whether the contractor has enough working room, what happens with drainage/access, and whether the finished extension still makes sense next to the retained crowns.
Architect-led work in Sheerwater is much easier when everybody uses the same base information. Tree references, crowns, RPAs and the planning layout should stay coordinated from the first design discussion through to the AIA and any later protection documents.
If you are discharging a tree condition in Sheerwater, send both the approved planning drawings and the current construction information. We need to see whether what is now proposed on site still matches the strategy that Woking Borough Council approved.
If the drainage or utility routes are not fixed on the Sheerwater project, mention that now. Keeping a trench away from important roots on the drawing is usually easier than engineering a solution after the route has been committed.
If the council has asked for tree information, send the exact wording.
A request for a “tree report” does not always mean the same document. At the early design stage it may mean a BS5837 Tree Survey and Tree Constraints Plan. Once a planning layout exists, the missing piece may be an Arboricultural Impact Assessment. After permission, the authority may be asking for an Arboricultural Method Statement, Tree Protection Plan or supervision before work starts.
You do not need to make that decision yourself. Forward the email, validation request, tree-officer comment or planning condition and include the current drawings. We will review what is already available and explain the next useful step before you instruct.








