BS5837 Tree Reports and Tree Surveys in Hook Heath
A request for tree information can arrive at any point in the planning process. The important thing is to establish what the project has already done, what the authority is asking for now and which drawings are current. From there the next step is usually straightforward.
If you already have a survey, send it. If you already have permission, send the condition. We can usually work out very quickly whether the next useful step is an update, an AIA, an AMS/TPP or site supervision.
Tight plots run out of space quickly. Crowns, RPAs, parking, access and the contractor all want the same ground. A small design move early can save a much bigger tree argument later.
If construction access is tight on the Hook Heath site, flag it early. The completed development may sit comfortably away from retained trees while construction traffic, storage and working space create the real risk.
If Woking Borough Council has asked for more tree information after submission, send the full response rather than summarising it. The answer may be a targeted update, an additional drawing or a missing BS5837 stage — and that distinction matters before more work is commissioned.
If the Hook Heath job has already stalled because somebody asked for tree information, tell us exactly what decision is waiting. We can focus the next piece of work on moving that decision forward rather than repeating material that already exists.
If the council has asked for tree information, send the exact wording.
A request for a “tree report” does not always mean the same document. At the early design stage it may mean a BS5837 Tree Survey and Tree Constraints Plan. Once a planning layout exists, the missing piece may be an Arboricultural Impact Assessment. After permission, the authority may be asking for an Arboricultural Method Statement, Tree Protection Plan or supervision before work starts.
You do not need to make that decision yourself. Forward the email, validation request, tree-officer comment or planning condition and include the current drawings. We will review what is already available and explain the next useful step before you instruct.








