BS5837 Tree Reports and Tree Surveys in Long Ditton
Programme matters. A survey may need a site visit; an AIA needs a stable enough design to assess; construction documents may depend on approved information. Telling us the deadline early helps set realistic expectations before instruction.
For a Long Ditton job, send the actual Elmbridge request and latest plan. We’ll scope the report around the real conflict — footprint, roots, crowns, access, services or construction — rather than applying a generic document package to a site-specific planning issue.
A drive or access can cause the tree problem even when the building is nowhere near the RPA. Excavation, level changes, compaction and site traffic all count, so we look at them as part of the actual scheme.
Replacement dwellings and infill schemes in Long Ditton need more than a simple overlap check. Future crown space, garden use, access, parking and the way the site is built can all influence whether the long-term tree/building relationship is sensible.
If you are discharging a tree condition in Long Ditton, send both the approved planning drawings and the current construction information. We need to see whether what is now proposed on site still matches the strategy that Elmbridge Borough Council approved.
Old report, old condition, new architect? Send all of it. We can usually separate what remains useful from what is superseded and explain the shortest sensible route forward.
If the council has asked for tree information, send the exact wording.
A request for a “tree report” does not always mean the same document. At the early design stage it may mean a BS5837 Tree Survey and Tree Constraints Plan. Once a planning layout exists, the missing piece may be an Arboricultural Impact Assessment. After permission, the authority may be asking for an Arboricultural Method Statement, Tree Protection Plan or supervision before work starts.
You do not need to make that decision yourself. Forward the email, validation request, tree-officer comment or planning condition and include the current drawings. We will review what is already available and explain the next useful step before you instruct.








