BS5837 Tree Reports and Tree Surveys in East Molesey
Some enquiries need baseline survey information. Others already have a survey and need an AIA, AMS, Tree Protection Plan or supervision. We review what is already there before recommending more work.
For a East Molesey job, send the actual Elmbridge request and latest plan. We’ll scope the report around the real conflict — footprint, roots, crowns, access, services or construction — rather than applying a generic document package to a site-specific planning issue.
Tight plots run out of space quickly. Crowns, RPAs, parking, access and the contractor all want the same ground. A small design move early can save a much bigger tree argument later.
Trees outside the boundary can still matter to a East Molesey proposal. A neighbouring crown can influence the finished relationship and a rooting area can extend into the site. We look at the physical constraint, not just who owns the trunk.
The planning officer should not have to work out which drawing the tree report is talking about. For East Molesey, the report should state the drawing revision clearly and use the same tree references throughout the submission.
For pre-start work in East Molesey, the questions become practical quickly: where is the fencing, how does the contractor get in, where can materials sit and which operations need an arboriculturist present? The approved documents need to answer those questions clearly.
If the council has asked for tree information, send the exact wording.
A request for a “tree report” does not always mean the same document. At the early design stage it may mean a BS5837 Tree Survey and Tree Constraints Plan. Once a planning layout exists, the missing piece may be an Arboricultural Impact Assessment. After permission, the authority may be asking for an Arboricultural Method Statement, Tree Protection Plan or supervision before work starts.
You do not need to make that decision yourself. Forward the email, validation request, tree-officer comment or planning condition and include the current drawings. We will review what is already available and explain the next useful step before you instruct.








