The issue may be foundations, access, surfacing, drainage, services, crown space or construction logistics rather than the building footprint alone. The report should deal with the whole relationship, not one measurement in isolation.
For a West Molesey job, send the actual Elmbridge request and latest plan. We’ll scope the report around the real conflict — footprint, roots, crowns, access, services or construction — rather than applying a generic document package to a site-specific planning issue.
Keep the tree information on the architect’s live drawing, not in a separate universe. If the footprint, levels, access or services change, we want the tree assessment checked against that same revision before it goes in.
On many West Molesey projects the biggest tree issue is not the building. It can be the driveway, parking, drainage, levels, scaffolding or the route the contractor needs to use during construction. Those parts of the scheme belong in the arboricultural review too.
Elmbridge Borough Council is assessing the development proposal, so the arboricultural information has to connect to the footprint, access, surfacing, levels, services and construction method that form part of that proposal.
For pre-start work in West Molesey, the questions become practical quickly: where is the fencing, how does the contractor get in, where can materials sit and which operations need an arboriculturist present? The approved documents need to answer those questions clearly.
If the council has asked for tree information, send the exact wording.
A request for a “tree report” does not always mean the same document. At the early design stage it may mean a BS5837 Tree Survey and Tree Constraints Plan. Once a planning layout exists, the missing piece may be an Arboricultural Impact Assessment. After permission, the authority may be asking for an Arboricultural Method Statement, Tree Protection Plan or supervision before work starts.
You do not need to make that decision yourself. Forward the email, validation request, tree-officer comment or planning condition and include the current drawings. We will review what is already available and explain the next useful step before you instruct.