BS5837 Tree Reports and Tree Surveys in Molesey
You do not need to choose from a technical menu before contacting us. We would rather see the original request and tell you what is relevant to the project as it stands.
For a Molesey job, send the actual Elmbridge request and latest plan. We’ll scope the report around the real conflict — footprint, roots, crowns, access, services or construction — rather than applying a generic document package to a site-specific planning issue.
A new footprint changes several things at once. We want to see the tree constraints, future crown space, access and how the site will actually be built before the layout becomes too expensive to move.
If the first thing you have been told is simply ‘you need a tree report’ for Molesey, forward the wording. That phrase can mean anything from baseline survey information to an AIA or a construction-stage Method Statement, and there is no benefit in guessing.
If Elmbridge Borough Council has asked for more tree information after submission, send the full response rather than summarising it. The answer may be a targeted update, an additional drawing or a missing BS5837 stage — and that distinction matters before more work is commissioned.
If the architect changes the Molesey design after the report is drafted, send the new drawing before the application goes in. Updating a live technical package is normal; submitting mismatched information is what causes avoidable questions.
If the council has asked for tree information, send the exact wording.
A request for a “tree report” does not always mean the same document. At the early design stage it may mean a BS5837 Tree Survey and Tree Constraints Plan. Once a planning layout exists, the missing piece may be an Arboricultural Impact Assessment. After permission, the authority may be asking for an Arboricultural Method Statement, Tree Protection Plan or supervision before work starts.
You do not need to make that decision yourself. Forward the email, validation request, tree-officer comment or planning condition and include the current drawings. We will review what is already available and explain the next useful step before you instruct.








