BS5837 Tree Reports and Tree Surveys in Hookwood
The issue may be foundations, access, surfacing, drainage, services, crown space or construction logistics rather than the building footprint alone. The report should deal with the whole relationship, not one measurement in isolation.
Send the current design and the wording you have been given. We can focus on the bit that matters — removals, footprint, access, surfacing, services, protection or condition discharge — with a scope proportionate to the scale and planning context of the proposal.
Keep the tree information on the architect’s live drawing, not in a separate universe. If the footprint, levels, access or services change, we want the tree assessment checked against that same revision before it goes in.
On many Hookwood projects the biggest tree issue is not the building. It can be the driveway, parking, drainage, levels, scaffolding or the route the contractor needs to use during construction. Those parts of the scheme belong in the arboricultural review too.
TPO and conservation-area controls sit alongside the BS5837 development process. If either applies to the Hookwood site, tell us. Tree quality under BS5837 and legal protection are different issues and should not be blurred together.
Homeowner, architect or developer — the starting point is the same. Show us what is being proposed and what the authority has asked for. We can deal with the report names after that.
If the council has asked for tree information, send the exact wording.
A request for a “tree report” does not always mean the same document. At the early design stage it may mean a BS5837 Tree Survey and Tree Constraints Plan. Once a planning layout exists, the missing piece may be an Arboricultural Impact Assessment. After permission, the authority may be asking for an Arboricultural Method Statement, Tree Protection Plan or supervision before work starts.
You do not need to make that decision yourself. Forward the email, validation request, tree-officer comment or planning condition and include the current drawings. We will review what is already available and explain the next useful step before you instruct.








