BS5837 Tree Reports and Tree Surveys in Earlswood
A request for tree information can arrive at any point in the planning process. The important thing is to establish what the project has already done, what the authority is asking for now and which drawings are current. From there the next step is usually straightforward.
Send the current design and the wording you have been given. We can focus on the bit that matters — removals, footprint, access, surfacing, services, protection or condition discharge — with a scope proportionate to the scale and planning context of the proposal.
A drive or access can cause the tree problem even when the building is nowhere near the RPA. Excavation, level changes, compaction and site traffic all count, so we look at them as part of the actual scheme.
Already have a tree survey for the Earlswood site? Send it. We can first check whether the information remains suitable for the live design. If it does, there may be no reason to repeat the entire survey just because the project has moved on.
Reigate and Banstead Borough Council is assessing the development proposal, so the arboricultural information has to connect to the footprint, access, surfacing, levels, services and construction method that form part of that proposal.
If the architect changes the Earlswood design after the report is drafted, send the new drawing before the application goes in. Updating a live technical package is normal; submitting mismatched information is what causes avoidable questions.
If the council has asked for tree information, send the exact wording.
A request for a “tree report” does not always mean the same document. At the early design stage it may mean a BS5837 Tree Survey and Tree Constraints Plan. Once a planning layout exists, the missing piece may be an Arboricultural Impact Assessment. After permission, the authority may be asking for an Arboricultural Method Statement, Tree Protection Plan or supervision before work starts.
You do not need to make that decision yourself. Forward the email, validation request, tree-officer comment or planning condition and include the current drawings. We will review what is already available and explain the next useful step before you instruct.








