BS5837 Tree Reports and Tree Surveys in Hindhead
A request for tree information can arrive at any point in the planning process. The important thing is to establish what the project has already done, what the authority is asking for now and which drawings are current. From there the next step is usually straightforward.
Send the current proposal and the exact Waverley wording. We can then tell you whether you need the survey/constraints stage, an AIA against the live layout, or construction-stage AMS/TPP information. The scope can therefore remain proportionate to the current stage rather than commissioning later-stage documents prematurely.
For this sort of job we normally check how close the excavation gets, whether the contractor has enough working room, what happens with drainage/access, and whether the finished extension still makes sense next to the retained crowns.
If the architect is still changing the Hindhead layout, send the current drawing now rather than waiting for the ‘final’ version. Tree information is most valuable while the footprint, access and service routes can still move without causing a redesign exercise later.
If you are discharging a tree condition in Hindhead, send both the approved planning drawings and the current construction information. We need to see whether what is now proposed on site still matches the strategy that Waverley Borough Council approved.
If the Hindhead job has already stalled because somebody asked for tree information, tell us exactly what decision is waiting. We can focus the next piece of work on moving that decision forward rather than repeating material that already exists.
If the council has asked for tree information, send the exact wording.
A request for a “tree report” does not always mean the same document. At the early design stage it may mean a BS5837 Tree Survey and Tree Constraints Plan. Once a planning layout exists, the missing piece may be an Arboricultural Impact Assessment. After permission, the authority may be asking for an Arboricultural Method Statement, Tree Protection Plan or supervision before work starts.
You do not need to make that decision yourself. Forward the email, validation request, tree-officer comment or planning condition and include the current drawings. We will review what is already available and explain the next useful step before you instruct.








