BS5837 Tree Reports and Tree Surveys in Egham
If the layout is still moving, survey and constraints information can help the architect make better decisions. If the design is already developed, the focus moves to assessing impacts and showing how retained trees can be protected.
Send the plans plus the Runnymede request or condition. We’ll tell you whether the urgent piece is design-stage survey information, planning justification, or the AMS/TPP and supervision needed before construction.
For Egham applications, the current drawing revision and any Runnymede wording are the key starting documents. The resulting report package can then be kept focused on the actual tree-related issue rather than expanding into unnecessary work.
Once permission is in, the conversation changes from ‘is the design acceptable?’ to ‘how are we going to build this without breaching the tree conditions?’ The AMS, TPP and supervision points need to work on a real site, not just on paper.
A smaller Egham planning application still deserves a proper answer, but it does not need to be buried under unnecessary paperwork. The report should be proportionate, clear and focused on the tree issues that can actually influence the decision.
If you are discharging a tree condition in Egham, send both the approved planning drawings and the current construction information. We need to see whether what is now proposed on site still matches the strategy that Runnymede Borough Council approved.
Old report, old condition, new architect? Send all of it. We can usually separate what remains useful from what is superseded and explain the shortest sensible route forward.
If the council has asked for tree information, send the exact wording.
A request for a “tree report” does not always mean the same document. At the early design stage it may mean a BS5837 Tree Survey and Tree Constraints Plan. Once a planning layout exists, the missing piece may be an Arboricultural Impact Assessment. After permission, the authority may be asking for an Arboricultural Method Statement, Tree Protection Plan or supervision before work starts.
You do not need to make that decision yourself. Forward the email, validation request, tree-officer comment or planning condition and include the current drawings. We will review what is already available and explain the next useful step before you instruct.








