BS5837 Tree Reports and Tree Surveys in Longcross
A request for tree information can arrive at any point in the planning process. The important thing is to establish what the project has already done, what the authority is asking for now and which drawings are current. From there the next step is usually straightforward.
Send the plans plus the Runnymede request or condition. We’ll tell you whether the urgent piece is design-stage survey information, planning justification, or the AMS/TPP and supervision needed before construction.
Tight plots run out of space quickly. Crowns, RPAs, parking, access and the contractor all want the same ground. A small design move early can save a much bigger tree argument later.
If construction access is tight on the Longcross site, flag it early. The completed development may sit comfortably away from retained trees while construction traffic, storage and working space create the real risk.
If you are discharging a tree condition in Longcross, send both the approved planning drawings and the current construction information. We need to see whether what is now proposed on site still matches the strategy that Runnymede Borough Council approved.
Before a Longcross application is submitted, make one simple check: the tree report and planning drawings should refer to the same design revision. That single coordination point prevents a surprising amount of unnecessary back-and-forth.
If the council has asked for tree information, send the exact wording.
A request for a “tree report” does not always mean the same document. At the early design stage it may mean a BS5837 Tree Survey and Tree Constraints Plan. Once a planning layout exists, the missing piece may be an Arboricultural Impact Assessment. After permission, the authority may be asking for an Arboricultural Method Statement, Tree Protection Plan or supervision before work starts.
You do not need to make that decision yourself. Forward the email, validation request, tree-officer comment or planning condition and include the current drawings. We will review what is already available and explain the next useful step before you instruct.








