BS5837 Tree Reports and Tree Surveys in Wormley
Programme matters. A survey may need a site visit; an AIA needs a stable enough design to assess; construction documents may depend on approved information. Telling us the deadline early helps set realistic expectations before instruction.
Send the current proposal and the exact Waverley wording. We can then tell you whether you need the survey/constraints stage, an AIA against the live layout, or construction-stage AMS/TPP information. The scope can therefore remain proportionate to the current stage rather than commissioning later-stage documents prematurely.
Tight plots run out of space quickly. Crowns, RPAs, parking, access and the contractor all want the same ground. A small design move early can save a much bigger tree argument later.
Trees outside the boundary can still matter to a Wormley proposal. A neighbouring crown can influence the finished relationship and a rooting area can extend into the site. We look at the physical constraint, not just who owns the trunk.
If Waverley Borough Council has asked for more tree information after submission, send the full response rather than summarising it. The answer may be a targeted update, an additional drawing or a missing BS5837 stage — and that distinction matters before more work is commissioned.
If the Wormley project has a submission or start-on-site deadline, say it straight away. We can then tell you whether the survey, reporting and any follow-on work can sensibly fit the programme before you instruct.
If the council has asked for tree information, send the exact wording.
A request for a “tree report” does not always mean the same document. At the early design stage it may mean a BS5837 Tree Survey and Tree Constraints Plan. Once a planning layout exists, the missing piece may be an Arboricultural Impact Assessment. After permission, the authority may be asking for an Arboricultural Method Statement, Tree Protection Plan or supervision before work starts.
You do not need to make that decision yourself. Forward the email, validation request, tree-officer comment or planning condition and include the current drawings. We will review what is already available and explain the next useful step before you instruct.








