BS5837 Tree Reports and Tree Surveys in Great Bookham
The issue may be foundations, access, surfacing, drainage, services, crown space or construction logistics rather than the building footprint alone. The report should deal with the whole relationship, not one measurement in isolation.
Send the plans plus any Mole Valley wording you already have. If the design is still flexible, we can use the survey/constraints information to help the architect. If permission is already in place, we can concentrate on the condition and site-protection side instead.
A new footprint changes several things at once. We want to see the tree constraints, future crown space, access and how the site will actually be built before the layout becomes too expensive to move.
Drainage and utilities often arrive late in the design process. If those routes are still being worked out for the Great Bookham project, tell us. A service trench can create a more significant root conflict than the building itself.
If the planning drawing has changed since the tree report was prepared, stop and send the revision before submission. A technically sound report attached to the wrong layout is an avoidable source of delay.
If the drainage or utility routes are not fixed on the Great Bookham project, mention that now. Keeping a trench away from important roots on the drawing is usually easier than engineering a solution after the route has been committed.
If the council has asked for tree information, send the exact wording.
A request for a “tree report” does not always mean the same document. At the early design stage it may mean a BS5837 Tree Survey and Tree Constraints Plan. Once a planning layout exists, the missing piece may be an Arboricultural Impact Assessment. After permission, the authority may be asking for an Arboricultural Method Statement, Tree Protection Plan or supervision before work starts.
You do not need to make that decision yourself. Forward the email, validation request, tree-officer comment or planning condition and include the current drawings. We will review what is already available and explain the next useful step before you instruct.








