BS5837 Tree Reports and Tree Surveys in Windlesham
A request for tree information can arrive at any point in the planning process. The important thing is to establish what the project has already done, what the authority is asking for now and which drawings are current. From there the next step is usually straightforward.
Once we have the latest plans and council wording, we can place the job at the right BS5837 stage and quote that stage properly. This keeps the commission proportionate to the actual planning requirement.
For this sort of job we normally check how close the excavation gets, whether the contractor has enough working room, what happens with drainage/access, and whether the finished extension still makes sense next to the retained crowns.
If the architect is still changing the Windlesham layout, send the current drawing now rather than waiting for the ‘final’ version. Tree information is most valuable while the footprint, access and service routes can still move without causing a redesign exercise later.
More pages do not make a stronger Windlesham submission by themselves. What matters is accurate tree information, a current plan, a clear explanation of the impact and mitigation that can genuinely be delivered.
If the Windlesham job has already stalled because somebody asked for tree information, tell us exactly what decision is waiting. We can focus the next piece of work on moving that decision forward rather than repeating material that already exists.
If the council has asked for tree information, send the exact wording.
A request for a “tree report” does not always mean the same document. At the early design stage it may mean a BS5837 Tree Survey and Tree Constraints Plan. Once a planning layout exists, the missing piece may be an Arboricultural Impact Assessment. After permission, the authority may be asking for an Arboricultural Method Statement, Tree Protection Plan or supervision before work starts.
You do not need to make that decision yourself. Forward the email, validation request, tree-officer comment or planning condition and include the current drawings. We will review what is already available and explain the next useful step before you instruct.








