BS5837 Tree Reports and Tree Surveys in West End
You do not need to choose from a technical menu before contacting us. We would rather see the original request and tell you what is relevant to the project as it stands.
For a West End job, send the actual Elmbridge request and latest plan. We’ll scope the report around the real conflict — footprint, roots, crowns, access, services or construction — rather than applying a generic document package to a site-specific planning issue.
Once permission is in, the conversation changes from ‘is the design acceptable?’ to ‘how are we going to build this without breaching the tree conditions?’ The AMS, TPP and supervision points need to work on a real site, not just on paper.
A smaller West End planning application still deserves a proper answer, but it does not need to be buried under unnecessary paperwork. The report should be proportionate, clear and focused on the tree issues that can actually influence the decision.
The planning officer should not have to work out which drawing the tree report is talking about. For West End, the report should state the drawing revision clearly and use the same tree references throughout the submission.
If the West End job has already stalled because somebody asked for tree information, tell us exactly what decision is waiting. We can focus the next piece of work on moving that decision forward rather than repeating material that already exists.
If the council has asked for tree information, send the exact wording.
A request for a “tree report” does not always mean the same document. At the early design stage it may mean a BS5837 Tree Survey and Tree Constraints Plan. Once a planning layout exists, the missing piece may be an Arboricultural Impact Assessment. After permission, the authority may be asking for an Arboricultural Method Statement, Tree Protection Plan or supervision before work starts.
You do not need to make that decision yourself. Forward the email, validation request, tree-officer comment or planning condition and include the current drawings. We will review what is already available and explain the next useful step before you instruct.








