BS5837 Tree Reports and Tree Surveys in Godalming
You do not need to choose from a technical menu before contacting us. We would rather see the original request and tell you what is relevant to the project as it stands.
Send the current proposal and the exact Waverley wording. We can then tell you whether you need the survey/constraints stage, an AIA against the live layout, or construction-stage AMS/TPP information. The scope can therefore remain proportionate to the current stage rather than commissioning later-stage documents prematurely.
For Godalming projects, send any existing tree information with the latest proposal. Reusing reliable tree references and base information can make updates faster and helps keep planning, design and construction documents internally consistent.
Keep the tree information on the architect’s live drawing, not in a separate universe. If the footprint, levels, access or services change, we want the tree assessment checked against that same revision before it goes in.
A revised Godalming design does not automatically mean starting the arboricultural work again. Send the new drawing and the previous report. We can identify what still stands and what has genuinely changed.
At feasibility stage in Godalming, the aim is to get enough reliable tree information to make the next design decision well. The detailed impact and construction documents can then follow when the project is ready for them.
If the Godalming job has already stalled because somebody asked for tree information, tell us exactly what decision is waiting. We can focus the next piece of work on moving that decision forward rather than repeating material that already exists.
If the council has asked for tree information, send the exact wording.
A request for a “tree report” does not always mean the same document. At the early design stage it may mean a BS5837 Tree Survey and Tree Constraints Plan. Once a planning layout exists, the missing piece may be an Arboricultural Impact Assessment. After permission, the authority may be asking for an Arboricultural Method Statement, Tree Protection Plan or supervision before work starts.
You do not need to make that decision yourself. Forward the email, validation request, tree-officer comment or planning condition and include the current drawings. We will review what is already available and explain the next useful step before you instruct.








