BS5837 Tree Reports and Tree Surveys in Felcourt
Programme matters. A survey may need a site visit; an AIA needs a stable enough design to assess; construction documents may depend on approved information. Telling us the deadline early helps set realistic expectations before instruction.
Send the current plan and Tandridge wording together. We can then build the evidence in the right order — survey first if needed, impact assessment once the design exists, and method/protection information when the scheme reaches construction.
Tight plots run out of space quickly. Crowns, RPAs, parking, access and the contractor all want the same ground. A small design move early can save a much bigger tree argument later.
Trees outside the boundary can still matter to a Felcourt proposal. A neighbouring crown can influence the finished relationship and a rooting area can extend into the site. We look at the physical constraint, not just who owns the trunk.
Tandridge District Council is assessing the development proposal, so the arboricultural information has to connect to the footprint, access, surfacing, levels, services and construction method that form part of that proposal.
For pre-start work in Felcourt, the questions become practical quickly: where is the fencing, how does the contractor get in, where can materials sit and which operations need an arboriculturist present? The approved documents need to answer those questions clearly.
If the council has asked for tree information, send the exact wording.
A request for a “tree report” does not always mean the same document. At the early design stage it may mean a BS5837 Tree Survey and Tree Constraints Plan. Once a planning layout exists, the missing piece may be an Arboricultural Impact Assessment. After permission, the authority may be asking for an Arboricultural Method Statement, Tree Protection Plan or supervision before work starts.
You do not need to make that decision yourself. Forward the email, validation request, tree-officer comment or planning condition and include the current drawings. We will review what is already available and explain the next useful step before you instruct.








