BS5837 Tree Reports and Tree Surveys in Tandridge
Programme matters. A survey may need a site visit; an AIA needs a stable enough design to assess; construction documents may depend on approved information. Telling us the deadline early helps set realistic expectations before instruction.
Send the current plan and Tandridge wording together. We can then build the evidence in the right order — survey first if needed, impact assessment once the design exists, and method/protection information when the scheme reaches construction.
For this sort of job we normally check how close the excavation gets, whether the contractor has enough working room, what happens with drainage/access, and whether the finished extension still makes sense next to the retained crowns.
Architect-led work in Tandridge is much easier when everybody uses the same base information. Tree references, crowns, RPAs and the planning layout should stay coordinated from the first design discussion through to the AIA and any later protection documents.
If Tandridge District Council has asked for more tree information after submission, send the full response rather than summarising it. The answer may be a targeted update, an additional drawing or a missing BS5837 stage — and that distinction matters before more work is commissioned.
If the Tandridge project has a submission or start-on-site deadline, say it straight away. We can then tell you whether the survey, reporting and any follow-on work can sensibly fit the programme before you instruct.
If the council has asked for tree information, send the exact wording.
A request for a “tree report” does not always mean the same document. At the early design stage it may mean a BS5837 Tree Survey and Tree Constraints Plan. Once a planning layout exists, the missing piece may be an Arboricultural Impact Assessment. After permission, the authority may be asking for an Arboricultural Method Statement, Tree Protection Plan or supervision before work starts.
You do not need to make that decision yourself. Forward the email, validation request, tree-officer comment or planning condition and include the current drawings. We will review what is already available and explain the next useful step before you instruct.








