BS5837 Tree Reports and Tree Surveys in Sidlow
The issue may be foundations, access, surfacing, drainage, services, crown space or construction logistics rather than the building footprint alone. The report should deal with the whole relationship, not one measurement in isolation.
Send the current design and the wording you have been given. We can focus on the bit that matters — removals, footprint, access, surfacing, services, protection or condition discharge — with a scope proportionate to the scale and planning context of the proposal.
Once permission is in, the conversation changes from ‘is the design acceptable?’ to ‘how are we going to build this without breaching the tree conditions?’ The AMS, TPP and supervision points need to work on a real site, not just on paper.
For a house extension in Sidlow, the important questions are normally practical: how close is the excavation, what happens to roots, can the contractor work safely in the available space and will the completed extension remain comfortable alongside the retained crown?
If you are discharging a tree condition in Sidlow, send both the approved planning drawings and the current construction information. We need to see whether what is now proposed on site still matches the strategy that Reigate and Banstead Borough Council approved.
You do not need a perfect project pack to request a quote for Sidlow. The current PDF plans, the site address and the wording you have received are enough to start a sensible review in most cases.
If the council has asked for tree information, send the exact wording.
A request for a “tree report” does not always mean the same document. At the early design stage it may mean a BS5837 Tree Survey and Tree Constraints Plan. Once a planning layout exists, the missing piece may be an Arboricultural Impact Assessment. After permission, the authority may be asking for an Arboricultural Method Statement, Tree Protection Plan or supervision before work starts.
You do not need to make that decision yourself. Forward the email, validation request, tree-officer comment or planning condition and include the current drawings. We will review what is already available and explain the next useful step before you instruct.








