BS5837 Tree Reports and Tree Surveys in Brockham
A request for tree information can arrive at any point in the planning process. The important thing is to establish what the project has already done, what the authority is asking for now and which drawings are current. From there the next step is usually straightforward.
Send the plans plus any Mole Valley wording you already have. If the design is still flexible, we can use the survey/constraints information to help the architect. If permission is already in place, we can concentrate on the condition and site-protection side instead.
A drive or access can cause the tree problem even when the building is nowhere near the RPA. Excavation, level changes, compaction and site traffic all count, so we look at them as part of the actual scheme.
Already have a tree survey for the Brockham site? Send it. We can first check whether the information remains suitable for the live design. If it does, there may be no reason to repeat the entire survey just because the project has moved on.
At feasibility stage in Brockham, the aim is to get enough reliable tree information to make the next design decision well. The detailed impact and construction documents can then follow when the project is ready for them.
Old report, old condition, new architect? Send all of it. We can usually separate what remains useful from what is superseded and explain the shortest sensible route forward.
If the council has asked for tree information, send the exact wording.
A request for a “tree report” does not always mean the same document. At the early design stage it may mean a BS5837 Tree Survey and Tree Constraints Plan. Once a planning layout exists, the missing piece may be an Arboricultural Impact Assessment. After permission, the authority may be asking for an Arboricultural Method Statement, Tree Protection Plan or supervision before work starts.
You do not need to make that decision yourself. Forward the email, validation request, tree-officer comment or planning condition and include the current drawings. We will review what is already available and explain the next useful step before you instruct.








